Source: sheltercluster.org
As of Friday May 15 – Government figures: 479,934 totally destroyed, 259,920 damaged. These gov’t figures do not expressly include additional numbers from May12 Earthquake
Donation from Government of 200,000NPR which includes: 2 bundles of CGIs (9ft), 1kgs of 3 inch nails, 10kgs of wire. HOWEVER PLEASE NOTE THAT THIS IS NOT CONFIRMED AND MAY BE A PURE CASH CONTRIBUTION. Decision still to be made by Government. Permanent: loans of 1.5mNPR for rural & 2.5mNPR for urban, with a 2% interest rate. Government response (drrportal.gov.np). Flight restrictions continue to cause delays in arrival of pipeline items. It is recommended that agencies plan transport by road. According to the logistics cluster restrictions are causing about 60% drop off in flights and a 70 plane backlog in other countries. Indian Government has opened up Kolkata as a relief port, 7 day drive, exploring the development of a humanitarian corridor.UN has established a hub at Charikot. In the UN Flash appeal the shelter sector committed to supporting 350,000 initially, shelter is 26% funded. Shelter Cluster agencies have reported that 177,000 tarps have been distributed so far. Initial reports following the May 12 earthquake estimates that Dulakha – 95-98% destroyed.
Publisher: SHELTER CLUSTER NEPAL/UN (SCN/UN)
|
Publisher:
SCN/UN
,
(2015
) |
Type / Script:
Draft
in English
|
Keywords:
EARTHQUAKES, EARTHQUAKE ZONES, NATURAL DISASTERS, DISASTER RELIEF, INTERNATIONAL RELIEF, EMERGENCY SHELTER, AID COORDINATION, CAPACITY BUILDING, INFORMATION NETWORKS, INFORMATION MANAGEMENT, RECONSTRUCTION, TECHNICAL COOPERATION
|
Thematic Group: UN
:
International Peace and Security
|
Thesaurus:
13.02.00
- Disaster Prevention, Preparedness And Relief
|
Reference Link:
|
|
|
** This document has been:
1337
times viewed
6
times downloaded. Feeder:
YASHOHANGMARAI
, Editor:
, Auditor:
View Document History
|
|
|
|